San Jose De Las Mulas

Project Start Date: | Saturday, February 11, 2006 |
Completion Date: | 9/11/2006 |
Target Completion | - |
People: | 280 |
Number of Homes: | 37 |
Project Details
- Spring flow of over 41 liters/min - quite adequate
- Conduction line upper tank = 800M
- Conduction line lower tank = 1360M
- Upper tank = 4.0 CU. M capacity
- Lower tank = 8 CU. M capacity
- Distribution network upper neighborhood = 2315M
- Distribution network lower neighborhood = 6231M